STEP 1

GET IN TOUCH

Tell us about your nature destination, location, number of visitors, key nature experiences you want to highlight and topography and potential challenges from nature point of view and possible Environmental Impact Assessment needs.

Within a week we will have a pre-design ready for your Hovering Trail footpath and observation platforms including layout and locations as well as early cost estimate and time schedule. We provide the pre-design and cost estimate with CAD visualizations for your presentations and budget planning.

STEP 2

PRE-DESIGN

We mandate a specialist to capture the topography of your site by using drone-mapping technology (UAV tech). It allows us to create a three dimensional model of your site that we combine with high definition satellite images to visualize it precisely.

STEP 3 

TOPOGRAPHICAL MAPPING

STEP 4

FINAL DESIGN

Once the footpath layout is approved, we move into exact positioning on the virtual site. Using the topographical mapping and a three dimension model of the trail designed, we are able to visualize your whole trail and work together on the last details of your design.

STEP 5

INSTALLATION

We provide a production and assembly schedule and assist with all necessary support for the site planning and assembly. It takes us around 2 months for the production of the modules and on site, the Hovering Trails can be installed for up to a 100m per week.

TEAM

BIRGIR ÞRÖSTUR JÓHANNSSON
ARCHITECT

ASTRID LELARGE
HISTORIAN PHD

GABRIEL CAUCHEMET
ARCHITECT

LAURENT NEY
ENGINEER AND DESIGNER

GÉRARD PETIT
TECHNICAL DESIGNER

ANTOINE BROUX
ENGINEER

BUSINESS & MARKETING

ÁSTA OLGA MAGNÚSDÓTTIR
PROJECT MANAGEMENT & PUBLIC RELATIONS

SNÆFRÍÐ ÞORSTEINSDÓTTIR GRAPHIC DESIGNER

KOLBEINN BJÖRNSSON
BUSINESS DEVELOPMENT